For most projects, the lead time from mold design approval to the first mold trial is approximately 25 to 45 days, depending on part size, structural complexity, mold type, and precision requirements. A simple single-cavity mold moves faster, while a multi-cavity, two-shot, or insert mold with tight cosmetic and dimensional requirements naturally takes longer. You will receive a detailed project schedule during quotation and planning, so you always know what happens when.
Mass-production lead time depends on order quantity, material availability, finishing processes such as spray painting or printing, assembly requirements, and current production capacity. With 80+ injection molding machines, two automated spray lines, and six assembly lines, we have the flexibility to absorb urgent projects and peak-season demand. If your launch window is tight, tell us the target date. Our project team will build a realistic plan around it and flag any risks early.